fried/toasted cheetos machine ,kurkure/niknak making machine

fried/toasted cheetos machine ,kurkure/niknak making machine

Model No.︰GPS

Brand Name︰saixin

Country of Origin︰China

Unit Price︰US $ 1 / pc

Minimum Order︰1 pc

Inquire Now

Product Description

Specifications

kurkure machine,kurkure extruder
cheetos making machine,corn curls machine
Twist corn machine,kurkure machine,cheetos making machine,Twist corn machine 

cheese curl machine,nik naks machine,cheetos machine  

Kurkure making machine,kurkure extruder,cheetos making machine,corn curls machine,cheese curl processing line,Rotary head extruder 

Machines involved in making Kurkure: 

a): Flour Mixer 

To mix corn meal with water to prepare the flour for Kurkure or nik naks

b): Rotary Die Extruder 

To cook the corn meal and extrude the Kurkure from the die. The Rotary Die twists and curls the meal before extruding giving a uniform texture 

c): Automatic Frying Machine 

To fry the Kurkure in hot cooking oil. The uniform frying introduces the crunchy taste to the Kurkure 

d) : Cooling Conveyor 

To cool the fried Kurkure and reduce the temperature before packing 

e): Automatic Seasoning System 

To add required seasoning to the fried and cooled Kurkure to give the different flavors to them 

f) : Automatic Packaging Machine 

To pack the Kurkure into attractive printed pouches with gas flushing.

Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.

Product Image